Production estimates are key to budgets and schedules

7-8 November 2019. Ahoy, Rotterdam, the Netherlands

Burgmans SH, Brevet R and Miller G - in2Dredging, Australia

Summary:
Accurate production estimates are key in determining budgets and schedules for any dredging project. This paper will take a different perspective on helping clients appreciate the pitfalls of optimistic budgets and unrealistic schedules.

01.burgmans_pdimage.png (105 K)

Jet modelling of a drag head’s heel jet

  • Unrealistic and optimistic budgets and schedules are an issue for both contractor and client
  • Suction and discharge production rates can be reliably estimated for most projects
  • Rock cutting production estimates should consider the entire cutting installation
  • Typically, low jetting production rates in impermeable sand and stiffer clay can be accurately estimated
  • Both contractors and clients can and should monitor dredges’ performance by acquiring digital data

Latest Exhibitors

  • logo_beeldmerk_damen.jpg (35 K)
  • tm_2col_1line.jpg (40 K)
  • nonius_engineering_2.png (24 K)
  • logo_cmyk_no_tagline.jpg (32 K)
  • ihc.jpg (37 K)
  • lagersmit_logo.jpg (52 K)
  • logo_remu.jpg (33 K)
  • logo_royal_van_oord_marineingenuity.jpg (34 K)
  • logo_usar.jpg (100 K)

book-my-space.png (7 K)

Last update: 5 September 2019